Our team provided Alerton direct digital controls for the renovation of this mixed-use building.
Our scope of work included:
- Adding the building’s following systems and equipment to the existing campus-wide Alerton controls system:
- Chilled water pumping station
- Dedicated outside air handling unit with heat recovery
- Variable air volume (VAV) air handling units
- 25 VAV boxes
- 27 fan coil units
- Building pressurization system
- Energy submetering