Atlanta Braves CoolToday Park 

North Port, FL

ATLANTA BRAVES.jpg

Image by Kent Hayes, Tandem Construction

Our team provided Alerton direct digital controls for the HVAC system at this spring training stadium for MLB's Atlanta Braves.  

The stadium (CoolToday Park) was the first building to be constructed in the Atlanta Braves Spring 

Our scope of work included:

  • Installation of Alerton DDC building automation system for the following HVAC equipment:
    • Nine rooftop package units
    • Five variable air volume (VAV) air handling units
    • 25 VAV boxes
    • Nine mini-split systems
    • 29 exhaust fans